<?xml version="1.0" encoding='utf-8'?>
<!DOCTYPE wml PUBLIC "-//WAPFORUM//DTD WML 1.1//EN" "http://www.wapforum.org/DTD/wml_1.1.xml">
<wml>
<card id="card1" title="Friant Dam - Page 10 - Wikipedia">
<p>
<a accesskey="1" href="page.php?w=Friant_Dam&amp;p=9">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Friant_Dam&amp;p=11">3.Next</a>
</p>
<p>after the first concrete was poured. However, the spillway gates, the water release valves and the two irrigation canals Friant was intended to support remained unfinished in the wake of the WPB's order.</p>

<p>The war, however, did not completely halt construction. Less than a year later, the WPB "[determined] the completion of the <a href="page.php?w=Madera_Canal">Madera Canal</a> and the installation of valves at the Friant Dam, necessary for war-time food and fiber production" - allowing construction to resume on a limited scale. A pair</p><p>
<a accesskey="1" href="page.php?w=Friant_Dam&amp;p=9">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Friant_Dam&amp;p=11">3.Next</a>
</p>

<do type="prev" label="Search">
        <go href="search.wml"/>
</do>

</card>
</wml>
