<?xml version="1.0" encoding='utf-8'?>
<!DOCTYPE wml PUBLIC "-//WAPFORUM//DTD WML 1.1//EN" "http://www.wapforum.org/DTD/wml_1.1.xml">
<wml>
<card id="card1" title="Holyoke Canal System - Page 10 - Wikipedia">
<p>
<a accesskey="1" href="page.php?w=Holyoke_Canal_System&amp;p=9">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Holyoke_Canal_System&amp;p=11">3.Next</a>
</p>
<p>the First but about 400 ft east. It begins at its south end, and runs north for over a mile. For its first 2000 ft, it is 140 ft wide, then gradually narrows to 100 ft. Its average water depth is 15 ft.</p>

<p>The Third Level Canal begins at the south end of the Second Level, but some 12 ft lower, and extends 3550 ft. It is about 100 ft wide and 10 ft deep, with an average height above the river varying between 23-28 ft.</p>

<p><big>Bridges</big></p>
<p>Throughout the three canals there are 28 bridges carrying cars, pedestrians, and parts of the former</p><p>
<a accesskey="1" href="page.php?w=Holyoke_Canal_System&amp;p=9">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Holyoke_Canal_System&amp;p=11">3.Next</a>
</p>

<do type="prev" label="Search">
        <go href="search.wml"/>
</do>

</card>
</wml>
