<?xml version="1.0" encoding='utf-8'?>
<!DOCTYPE wml PUBLIC "-//WAPFORUM//DTD WML 1.1//EN" "http://www.wapforum.org/DTD/wml_1.1.xml">
<wml>
<card id="card1" title="Toei Mita Line - Page 10 - Wikipedia">
<p>
<a accesskey="1" href="page.php?w=Toei_Mita_Line&amp;p=9">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Toei_Mita_Line&amp;p=11">3.Next</a>
</p>
<p>the route would continue to the then-<a href="page.php?w=Tokyu_Den-en-toshi_Line">Den-en-toshi Line</a> and finally west, down to . As a result, the construction standards of Line 6 were based on those of Tobu and Tokyu (such as  gauge track and 20-meter-long cars - today, the Mita Line is the only Toei line to use this gauge). A depot was planned at Shimura, independent of the Nishi-Magome depot on Line 1.</p>

<p>However, both Tokyu and Tobu decided the following year to operate their thorough services with the <a href="page.php?w=Teito_Rapid_Transit_Authority">Teito Rapid Transit Authority</a></p><p>
<a accesskey="1" href="page.php?w=Toei_Mita_Line&amp;p=9">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Toei_Mita_Line&amp;p=11">3.Next</a>
</p>

<do type="prev" label="Search">
        <go href="search.wml"/>
</do>

</card>
</wml>
