<?xml version="1.0" encoding='utf-8'?>
<!DOCTYPE wml PUBLIC "-//WAPFORUM//DTD WML 1.1//EN" "http://www.wapforum.org/DTD/wml_1.1.xml">
<wml>
<card id="card1" title="Marshall Space Flight Center - Page 12 - Wikipedia">
<p>
<a accesskey="1" href="page.php?w=Marshall_Space_Flight_Center&amp;p=11">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Marshall_Space_Flight_Center&amp;p=13">3.Next</a>
</p>
<p>intended for both the U.S. Army and U.S. Navy, this was designated the <a href="page.php?w=PGM-19_Jupiter">PGM-19 Jupiter</a>. Guidance component testing for this Jupiter intermediate range ballistic missile (IRBM) began in March 1956 on a modified Redstone missile dubbed Jupiter A while re-entry vehicle testing began in September 1956 on a Redstone with spin-stabilized upper stages. This ABMA developed <a href="page.php?w=Jupiter-C">Jupiter-C</a> was composed of a Redstone rocket first stage and two upper stages for RV tests or three upper stages</p><p>
<a accesskey="1" href="page.php?w=Marshall_Space_Flight_Center&amp;p=11">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Marshall_Space_Flight_Center&amp;p=13">3.Next</a>
</p>

<do type="prev" label="Search">
        <go href="search.wml"/>
</do>

</card>
</wml>
