<?xml version="1.0" encoding='utf-8'?>
<!DOCTYPE wml PUBLIC "-//WAPFORUM//DTD WML 1.1//EN" "http://www.wapforum.org/DTD/wml_1.1.xml">
<wml>
<card id="card1" title="Automotive engineering - Page 13 - Wikipedia">
<p>
<a accesskey="1" href="page.php?w=automotive_engineering&amp;p=12">1.Previous</a><br />
<a accesskey="3" href="page.php?w=automotive_engineering&amp;p=14">3.Next</a>
</p>
<p>split into the effect on the <a href="page.php?w=variable_cost">variable cost</a> of the vehicle, and the up-front tooling and <a href="page.php?w=fixed_cost">fixed cost</a>s associated with developing the vehicle. There are also costs associated with warranty reductions and marketing.</p>

<p><b>Program timing</b>: To some extent programs are timed with respect to the market, and also to the production-schedules of assembly plants. Any new part in the design must support the development and manufacturing schedule of the model.</p>

<p><b><a href="page.php?w=Design_for_manufacturability">Design for manufacturability (DFM)</a></b>:</p><p>
<a accesskey="1" href="page.php?w=automotive_engineering&amp;p=12">1.Previous</a><br />
<a accesskey="3" href="page.php?w=automotive_engineering&amp;p=14">3.Next</a>
</p>

<do type="prev" label="Search">
        <go href="search.wml"/>
</do>

</card>
</wml>
