<?xml version="1.0" encoding='utf-8'?>
<!DOCTYPE wml PUBLIC "-//WAPFORUM//DTD WML 1.1//EN" "http://www.wapforum.org/DTD/wml_1.1.xml">
<wml>
<card id="card1" title="Middlewich Branch - Page 14 - Wikipedia">
<p>
<a accesskey="1" href="page.php?w=Middlewich_Branch&amp;p=13">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Middlewich_Branch&amp;p=15">3.Next</a>
</p>
<p>18 in railway track was laid alongside the canal, and a small locomotive from Crewe railway works was used to haul barges. The trials were suggested by the LNWR's mechanical engineer Francis Webb, and a report was produced by the Canal's engineer G. R. Jebb in 1889. Although the locomotive had successfully pulled two, four and then eight boats at speeds up to 7 mph, no further action was taken.</p>

<p>Some traffic on the branch was lost when the <a href="page.php?w=Anderton_Lift">Anderton Lift</a> was opened in 1875, providing a link from the</p><p>
<a accesskey="1" href="page.php?w=Middlewich_Branch&amp;p=13">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Middlewich_Branch&amp;p=15">3.Next</a>
</p>

<do type="prev" label="Search">
        <go href="search.wml"/>
</do>

</card>
</wml>
