<?xml version="1.0" encoding='utf-8'?>
<!DOCTYPE wml PUBLIC "-//WAPFORUM//DTD WML 1.1//EN" "http://www.wapforum.org/DTD/wml_1.1.xml">
<wml>
<card id="card1" title="Systems development life cycle - Page 15 - Wikipedia">
<p>
<a accesskey="1" href="page.php?w=systems_development_life_cycle&amp;p=14">1.Previous</a><br />
<a accesskey="3" href="page.php?w=systems_development_life_cycle&amp;p=16">3.Next</a>
</p>
<p>(SOW). The development of an SOW does not occur during a specific phase of SDLC but is developed to include the work from the SDLC process that may be conducted by contractors.</p>

<p><big>Baselines</big></p>
<p>Baselines are established after four of the five phases of the SDLC, and are critical to the <a href="page.php?w=Iteration">iterative</a> nature of the model. Baselines become milestones.</p>

<p>
* functional baseline: established after the conceptual design phase.<br/>
* allocated baseline: established after the preliminary design phase.<br/>
*</p><p>
<a accesskey="1" href="page.php?w=systems_development_life_cycle&amp;p=14">1.Previous</a><br />
<a accesskey="3" href="page.php?w=systems_development_life_cycle&amp;p=16">3.Next</a>
</p>

<do type="prev" label="Search">
        <go href="search.wml"/>
</do>

</card>
</wml>
