<?xml version="1.0" encoding='utf-8'?>
<!DOCTYPE wml PUBLIC "-//WAPFORUM//DTD WML 1.1//EN" "http://www.wapforum.org/DTD/wml_1.1.xml">
<wml>
<card id="card1" title="Istanbul Metro - Page 16 - Wikipedia">
<p>
<a accesskey="1" href="page.php?w=Istanbul_Metro&amp;p=15">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Istanbul_Metro&amp;p=17">3.Next</a>
</p>
<p>M2 line will reach 23 km when all 16 stations from Haciosman to Yenikapi will be completed; not including the -long <a href="page.php?w=Golden_Horn_Metro_Bridge">Golden Horn Metro Bridge</a>, the 0.6 km long Taksim-Kabatas tunnel connection with the <a href="page.php?w=IDO">Seabus</a> port, and the 0.6 km long Yenikapi-Aksaray tunnel connecting the M1 line to the <a href="page.php?w=Yenikapi_Transfer_Center">Yenikapi Transfer Center</a>.</p>

<p>On the Asian side, construction is in progress of the remaining portion of the 26.5 km long <a href="page.php?w=M4_%28Istanbul_Metro%29">M4</a></p><p>
<a accesskey="1" href="page.php?w=Istanbul_Metro&amp;p=15">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Istanbul_Metro&amp;p=17">3.Next</a>
</p>

<do type="prev" label="Search">
        <go href="search.wml"/>
</do>

</card>
</wml>
