<?xml version="1.0" encoding='utf-8'?>
<!DOCTYPE wml PUBLIC "-//WAPFORUM//DTD WML 1.1//EN" "http://www.wapforum.org/DTD/wml_1.1.xml">
<wml>
<card id="card1" title="EBART - Page 17 - Wikipedia">
<p>
<a accesskey="1" href="page.php?w=eBART&amp;p=16">1.Previous</a><br />
<a accesskey="3" href="page.php?w=eBART&amp;p=18">3.Next</a>
</p>
<p>Rail Commission indicated that eBART could be extended to <a href="page.php?w=Tracy_Transit_Center">Tracy</a>, where it would connect with the <a href="page.php?w=Altamont_Corridor_Express">Altamont Corridor Express</a> and the proposed <a href="page.php?w=Valley_Link">Valley Link</a> line. An extension to Tracy is possible only if rights to share the Mococo Line right-of-way are acquired from UPRR. This would create a transit loop connecting the current eastern termini of the BART Yellow (Pittsburg/Bay Point) and Blue (Dublin/Pleasanton) lines.</p><p>
<a accesskey="1" href="page.php?w=eBART&amp;p=16">1.Previous</a><br />
<a accesskey="3" href="page.php?w=eBART&amp;p=18">3.Next</a>
</p>

<do type="prev" label="Search">
        <go href="search.wml"/>
</do>

</card>
</wml>
