<?xml version="1.0" encoding='utf-8'?>
<!DOCTYPE wml PUBLIC "-//WAPFORUM//DTD WML 1.1//EN" "http://www.wapforum.org/DTD/wml_1.1.xml">
<wml>
<card id="card1" title="Integrated Electronic Control Centre - Page 18 - Wikipedia">
<p>
<a accesskey="1" href="page.php?w=Integrated_Electronic_Control_Centre&amp;p=17">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Integrated_Electronic_Control_Centre&amp;p=19">3.Next</a>
</p>
<p>impact operational performance by incorrectly preparing data; thus working practices were changed so that only dedicated personnel would perform data preparation. In response to a recommendation made in the aftermath of the <a href="page.php?w=Ladbroke_Grove_rail_crash">Ladbroke Grove rail crash</a>, a <a href="page.php?w=Signal_passed_at_danger">SPAD</a> monitor subsystem was rolled out to every IECC. </p>

<p>In 2006, the AEA rail business became DeltaRail (now called <a href="page.php?w=Resonate_Group">Resonate Group</a>), who have developed</p><p>
<a accesskey="1" href="page.php?w=Integrated_Electronic_Control_Centre&amp;p=17">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Integrated_Electronic_Control_Centre&amp;p=19">3.Next</a>
</p>

<do type="prev" label="Search">
        <go href="search.wml"/>
</do>

</card>
</wml>
