<?xml version="1.0" encoding='utf-8'?>
<!DOCTYPE wml PUBLIC "-//WAPFORUM//DTD WML 1.1//EN" "http://www.wapforum.org/DTD/wml_1.1.xml">
<wml>
<card id="card1" title="Long Range Strike Bomber - Page 19 - Wikipedia">
<p>
<a accesskey="1" href="page.php?w=Long_Range_Strike_Bomber&amp;p=18">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Long_Range_Strike_Bomber&amp;p=20">3.Next</a>
</p>
<p>of existing models, such as derivative technologies of the F-35. The LRS-B is intended to perform any long range mission, rather than one specialized mission, which drove up the cost of the B-2. The USAF expects it to cost $1 billion each with development costs factored in, and aims for a per-aircraft cost of $550 million, considered reasonable for a limited production run military aircraft.</p>

<p><big> Production proposals, timeframe </big></p>
<p>On 25 October 2013, <a href="page.php?w=Boeing">Boeing</a> and <a href="page.php?w=Lockheed_Martin">Lockheed Martin</a></p><p>
<a accesskey="1" href="page.php?w=Long_Range_Strike_Bomber&amp;p=18">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Long_Range_Strike_Bomber&amp;p=20">3.Next</a>
</p>

<do type="prev" label="Search">
        <go href="search.wml"/>
</do>

</card>
</wml>
