<?xml version="1.0" encoding='utf-8'?>
<!DOCTYPE wml PUBLIC "-//WAPFORUM//DTD WML 1.1//EN" "http://www.wapforum.org/DTD/wml_1.1.xml">
<wml>
<card id="card1" title="Conon Hydro Scheme - Page 2 - Wikipedia">
<p>
<a accesskey="1" href="page.php?w=Conon_Hydro_Scheme&amp;p=1">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Conon_Hydro_Scheme&amp;p=3">3.Next</a>
</p>
<p>between 1946 and 1961. It is now operated by <a href="page.php?w=SSE_Renewables">SSE Renewables</a>.</p>

<p>The scheme contains six power stations at Achanalt, Grudie Bridge, Mossford, Luichart, Orrin, and Torr Achilty. They have a total capacity of 107.2&nbsp;MW and an annual output of around 470&nbsp;GWh (or million units per year). Water is impounded in eight reservoirs by nine large dams. There is also a complex series of nine tunnels and many aqueducts to divert the water to the power stations, some coming from other river basin catchments.</p><p>
<a accesskey="1" href="page.php?w=Conon_Hydro_Scheme&amp;p=1">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Conon_Hydro_Scheme&amp;p=3">3.Next</a>
</p>

<do type="prev" label="Search">
        <go href="search.wml"/>
</do>

</card>
</wml>
