<?xml version="1.0" encoding='utf-8'?>
<!DOCTYPE wml PUBLIC "-//WAPFORUM//DTD WML 1.1//EN" "http://www.wapforum.org/DTD/wml_1.1.xml">
<wml>
<card id="card1" title="High Speed 2 - Page 2 - Wikipedia">
<p>
<a accesskey="1" href="page.php?w=High_Speed_2&amp;p=1">1.Previous</a><br />
<a accesskey="3" href="page.php?w=High_Speed_2&amp;p=3">3.Next</a>
</p>
<p>which connects London to the <a href="page.php?w=Channel_Tunnel">Channel Tunnel</a>. London and Birmingham are to be served directly by new high-speed track, with services continuing beyond the core route on the existing <a href="page.php?w=West_Coast_Main_Line">West Coast Main Line</a>. When proposed in 2010, Phase 1 was expected to open by December 2026; however, as of May 2026, passenger services are not expected to begin before 2036.</p>

<p>The new track is being constructed between <a href="page.php?w=London_Euston">London Euston</a> and</p><p>
<a accesskey="1" href="page.php?w=High_Speed_2&amp;p=1">1.Previous</a><br />
<a accesskey="3" href="page.php?w=High_Speed_2&amp;p=3">3.Next</a>
</p>

<do type="prev" label="Search">
        <go href="search.wml"/>
</do>

</card>
</wml>
