<?xml version="1.0" encoding='utf-8'?>
<!DOCTYPE wml PUBLIC "-//WAPFORUM//DTD WML 1.1//EN" "http://www.wapforum.org/DTD/wml_1.1.xml">
<wml>
<card id="card1" title="Meteor Lake - Page 2 - Wikipedia">
<p>
<a accesskey="1" href="page.php?w=Meteor_Lake&amp;p=1">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Meteor_Lake&amp;p=3">3.Next</a>
</p>
<p>TDP range for various segments ranging from ultra low power mobile to enthusiast desktop. The initial tape-in process for Meteor Lake took place in May 2021. The CPU compute tile was confirmed to be fabricated on Intel's 7 nm process (since rebranded to "Intel 4").</p>

<p>In October 2021, Intel said in an earnings call that it had taped out the CPU compute tile for Meteor Lake and after it was received it had powered on within 30 minutes and with expected performance levels. In April 2022, Intel announced that an assembled Meteor Lake mobile</p><p>
<a accesskey="1" href="page.php?w=Meteor_Lake&amp;p=1">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Meteor_Lake&amp;p=3">3.Next</a>
</p>

<do type="prev" label="Search">
        <go href="search.wml"/>
</do>

</card>
</wml>
