<?xml version="1.0" encoding='utf-8'?>
<!DOCTYPE wml PUBLIC "-//WAPFORUM//DTD WML 1.1//EN" "http://www.wapforum.org/DTD/wml_1.1.xml">
<wml>
<card id="card1" title="Hazard Analysis Critical Control Point - Page 20 - Wikipedia">
<p>
<a accesskey="1" href="page.php?w=Hazard_Analysis_Critical_Control_Point&amp;p=19">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Hazard_Analysis_Critical_Control_Point&amp;p=21">3.Next</a>
</p>
<p>a safe product. Plants will be required to validate their own HACCP plans. FSIS will not approve HACCP plans in advance, but will review them for conformance with the final rule.<br/>
#: <a href="page.php?w=Verification_and_validation">Verification</a> ensures the HACCP plan is adequate, that is, working as intended. Verification procedures may include such activities as review of HACCP plans, CCP records, critical limits and microbial sampling and analysis. FSIS is requiring that the HACCP plan include verification tasks to be performed by plant</p><p>
<a accesskey="1" href="page.php?w=Hazard_Analysis_Critical_Control_Point&amp;p=19">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Hazard_Analysis_Critical_Control_Point&amp;p=21">3.Next</a>
</p>

<do type="prev" label="Search">
        <go href="search.wml"/>
</do>

</card>
</wml>
