<?xml version="1.0" encoding='utf-8'?>
<!DOCTYPE wml PUBLIC "-//WAPFORUM//DTD WML 1.1//EN" "http://www.wapforum.org/DTD/wml_1.1.xml">
<wml>
<card id="card1" title="Limerick Tunnel - Page 3 - Wikipedia">
<p>
<a accesskey="1" href="page.php?w=Limerick_Tunnel&amp;p=2">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Limerick_Tunnel&amp;p=4">3.Next</a>
</p>
<p>on 27 July 2010, two months ahead of schedule.</p>

<p><big>Tolling</big></p>
<p>The Austrian EFKON Group commissioned, built and currently operate two toll collection locations, one ten-lane and one six-lane plaza, both staffed.</p>

<p>The tolling locations are both north of the Shannon. One is between junctions 3 and 4 of the N18, and the other is between N18 junction 3 and the Clonmacken Roundabout.</p>

<p><big>See also</big></p>
<p>
*<a href="page.php?w=Jack_Lynch_Tunnel">Jack Lynch Tunnel</a>, on the N40 southern ring road of <a href="page.php?w=Cork_%28city%29">Cork</a></p><p>
<a accesskey="1" href="page.php?w=Limerick_Tunnel&amp;p=2">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Limerick_Tunnel&amp;p=4">3.Next</a>
</p>

<do type="prev" label="Search">
        <go href="search.wml"/>
</do>

</card>
</wml>
