<?xml version="1.0" encoding='utf-8'?>
<!DOCTYPE wml PUBLIC "-//WAPFORUM//DTD WML 1.1//EN" "http://www.wapforum.org/DTD/wml_1.1.xml">
<wml>
<card id="card1" title="Metro Line - Page 3 - Wikipedia">
<p>
<a accesskey="1" href="page.php?w=Metro_Line&amp;p=2">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Metro_Line&amp;p=4">3.Next</a>
</p>
<p>of the <a href="page.php?w=Epcor_Tower">Epcor Tower</a>, the City ordered that the tunnel section below the tower be dug before the tower was completed. This saved $140 million from digging after the tower was built. The remainder of the tunnel, under <a href="page.php?w=Downtown_Edmonton">Downtown Edmonton</a>, was constructed using the <a href="page.php?w=sequential_excavation_method">sequential excavation method</a> and completed in November 2012. In 2009 the City approved the relocation of funds from the <a href="page.php?w=Gorman%2C_Edmonton">Gorman</a></p><p>
<a accesskey="1" href="page.php?w=Metro_Line&amp;p=2">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Metro_Line&amp;p=4">3.Next</a>
</p>

<do type="prev" label="Search">
        <go href="search.wml"/>
</do>

</card>
</wml>
