<?xml version="1.0" encoding='utf-8'?>
<!DOCTYPE wml PUBLIC "-//WAPFORUM//DTD WML 1.1//EN" "http://www.wapforum.org/DTD/wml_1.1.xml">
<wml>
<card id="card1" title="Pallivasal Hydro Electric Project - Page 3 - Wikipedia">
<p>
<a accesskey="1" href="page.php?w=Pallivasal_Hydro_Electric_Project&amp;p=2">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Pallivasal_Hydro_Electric_Project&amp;p=4">3.Next</a>
</p>
<p>increased from 4.5 MW to 5 MW by replacing the water wheels. In the first phase of the project, three units of 5 MW capacity were completed and the capacity of 15 MW was achieved. In the second phase, three turbines of 7.5 MW capacity, and the <a href="page.php?w=Kundala_Dam">Kundala Dam</a> and <a href="page.php?w=Mattupetty_Dam">Mattupetti Dam</a> for water storage were constructed, which took the installed capacity of the project to 37 MW.</p>

<p><big>Power generation</big></p>
<p>The Pallivasal Hydroelectric Project is generating 37.5 MW of electricity</p><p>
<a accesskey="1" href="page.php?w=Pallivasal_Hydro_Electric_Project&amp;p=2">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Pallivasal_Hydro_Electric_Project&amp;p=4">3.Next</a>
</p>

<do type="prev" label="Search">
        <go href="search.wml"/>
</do>

</card>
</wml>
