<?xml version="1.0" encoding='utf-8'?>
<!DOCTYPE wml PUBLIC "-//WAPFORUM//DTD WML 1.1//EN" "http://www.wapforum.org/DTD/wml_1.1.xml">
<wml>
<card id="card1" title="Incident Command System - Page 31 - Wikipedia">
<p>
<a accesskey="1" href="page.php?w=Incident_Command_System&amp;p=30">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Incident_Command_System&amp;p=32">3.Next</a>
</p>
<p>objectives to both operational and support personnel. They include measurable, strategic objectives set for achievement within a time frame (also known as an operational period) which is usually 12 hours but can be any length of time. Hazardous material incidents (hazmat) must be written, and are prepared by the planning section, but other incident reports can be both verbal and/or written.</p>

<p>The consolidated IAP is a very important component of the ICS that reduces freelancing and ensures a coordinated response. At the simplest level,</p><p>
<a accesskey="1" href="page.php?w=Incident_Command_System&amp;p=30">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Incident_Command_System&amp;p=32">3.Next</a>
</p>

<do type="prev" label="Search">
        <go href="search.wml"/>
</do>

</card>
</wml>
