<?xml version="1.0" encoding='utf-8'?>
<!DOCTYPE wml PUBLIC "-//WAPFORUM//DTD WML 1.1//EN" "http://www.wapforum.org/DTD/wml_1.1.xml">
<wml>
<card id="card1" title="CE-20 - Page 4 - Wikipedia">
<p>
<a accesskey="1" href="page.php?w=CE-20&amp;p=3">1.Previous</a><br />
<a accesskey="3" href="page.php?w=CE-20&amp;p=5">3.Next</a>
</p>
<p>was preceded by two cold start tests and four short duration hot tests.<br/>
* On 16 July 2015, the first developmental CE-20 engine 'E1' was successfully endurance hot tested at ISRO Propulsion Complex, Mahendragiri for a duration of 800 seconds with Mixture Ratio Controller (MRC) in closed loop mode. This duration is approximately 25% more than the engine burn duration in flight. This was tenth development test for CE-20.<br/>
* On 10 August 2015, a short duration (5.7 seconds) hot test on the CE-20 engine was done to demonstrate the successful</p><p>
<a accesskey="1" href="page.php?w=CE-20&amp;p=3">1.Previous</a><br />
<a accesskey="3" href="page.php?w=CE-20&amp;p=5">3.Next</a>
</p>

<do type="prev" label="Search">
        <go href="search.wml"/>
</do>

</card>
</wml>
