<p>was the last of the three dams in the Aspinall Unit of the Colorado River Storage Project to be completed. Crystal Dam's design and construction lagged behind Morrow Point and <a href="page.php?w=Blue_Mesa_Dam">Blue Mesa</a> dams. Construction started in 1964 on a materials borrow pit, with construction at the damsite beginning in 1965 for an access road and exploratory drilling. Work then stopped for five years. Initially planned as an earth-fill dam, the design was changed to a double-curvature, thin-shell concrete arch dam. After an initial</p><p>
<a accesskey="1" href="page.php?w=Crystal_Dam&amp;p=3">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Crystal_Dam&amp;p=5">3.Next</a>
</p>

<do type="prev" label="Search">
        <go href="search.wml"/>
</do>

</card>
</wml>