<?xml version="1.0" encoding='utf-8'?>
<!DOCTYPE wml PUBLIC "-//WAPFORUM//DTD WML 1.1//EN" "http://www.wapforum.org/DTD/wml_1.1.xml">
<wml>
<card id="card1" title="Fehmarn Belt fixed link - Page 4 - Wikipedia">
<p>
<a accesskey="1" href="page.php?w=Fehmarn_Belt_fixed_link&amp;p=3">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Fehmarn_Belt_fixed_link&amp;p=5">3.Next</a>
</p>
<p>via <a href="page.php?w=Jutland">Jutland</a> and <a href="page.php?w=Funen">Funen</a>. Travel time between Lolland and Fehmarn is to be reduced from 45 minutes by ferry (excluding waiting and boarding time) to 10 minutes by car and seven minutes by train. The electrified <a href="page.php?w=high-speed_rail_in_Europe">high-speed rail</a> line will be capable of reaching 200 km/h.</p>

<p>Designed and financed by Danish state-owned <a href="page.php?w=Femern_A%2FS">Femern A/S</a>, the tunnel was approved in 2015 with a construction budget of 52.6</p><p>
<a accesskey="1" href="page.php?w=Fehmarn_Belt_fixed_link&amp;p=3">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Fehmarn_Belt_fixed_link&amp;p=5">3.Next</a>
</p>

<do type="prev" label="Search">
        <go href="search.wml"/>
</do>

</card>
</wml>
