<?xml version="1.0" encoding='utf-8'?>
<!DOCTYPE wml PUBLIC "-//WAPFORUM//DTD WML 1.1//EN" "http://www.wapforum.org/DTD/wml_1.1.xml">
<wml>
<card id="card1" title="High Speed 2 - Page 4 - Wikipedia">
<p>
<a accesskey="1" href="page.php?w=High_Speed_2&amp;p=3">1.Previous</a><br />
<a accesskey="3" href="page.php?w=High_Speed_2&amp;p=5">3.Next</a>
</p>
<p>a maximum speed of 320 km/h on HS2 track; on the conventional rail network, services will operate at speeds of up to 125 mph.</p>

<p>The length of the new track has been reduced substantially since the scheme was first announced in 2012. It was originally to be split into eastern and western branches north of Birmingham Interchange. The eastern branch would have connected to the <a href="page.php?w=Midland_Main_Line">Midland Main Line</a> at <a href="page.php?w=Clay_Cross">Clay Cross</a> in <a href="page.php?w=Derbyshire">Derbyshire</a> and</p><p>
<a accesskey="1" href="page.php?w=High_Speed_2&amp;p=3">1.Previous</a><br />
<a accesskey="3" href="page.php?w=High_Speed_2&amp;p=5">3.Next</a>
</p>

<do type="prev" label="Search">
        <go href="search.wml"/>
</do>

</card>
</wml>
