<?xml version="1.0" encoding='utf-8'?>
<!DOCTYPE wml PUBLIC "-//WAPFORUM//DTD WML 1.1//EN" "http://www.wapforum.org/DTD/wml_1.1.xml">
<wml>
<card id="card1" title="Slough Arm - Page 4 - Wikipedia">
<p>
<a accesskey="1" href="page.php?w=Slough_Arm&amp;p=3">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Slough_Arm&amp;p=5">3.Next</a>
</p>
<p>the Melton Mowbray Canal.  The route included a major cutting and embankment at <a href="page.php?w=Iver">Iver</a>, which were started in February and May respectively.  By April 1881, work was also in progress at the Slough end.  The major earthworks at Iver were completed in June 1882, and the canal opened throughout on 4 December 1882. It was about 5 miles (8&nbsp;km) long, and did not require any locks.</p>

<p>Walker remained after the canal opened to oversee the construction of wharves and landing places, to sort out any problems resulting</p><p>
<a accesskey="1" href="page.php?w=Slough_Arm&amp;p=3">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Slough_Arm&amp;p=5">3.Next</a>
</p>

<do type="prev" label="Search">
        <go href="search.wml"/>
</do>

</card>
</wml>
