<?xml version="1.0" encoding='utf-8'?>
<!DOCTYPE wml PUBLIC "-//WAPFORUM//DTD WML 1.1//EN" "http://www.wapforum.org/DTD/wml_1.1.xml">
<wml>
<card id="card1" title="GO Transit - Page 5 - Wikipedia">
<p>
<a accesskey="1" href="page.php?w=GO_Transit&amp;p=4">1.Previous</a><br />
<a accesskey="3" href="page.php?w=GO_Transit&amp;p=6">3.Next</a>
</p>
<p>which is scheduled to be completed in phases through 2025-2032.</p>

<p><big> History </big></p>
<p><big> Early days </big></p>
<p>Cities in and around the <a href="page.php?w=Greater_Toronto_and_Hamilton_Area">Greater Toronto and Hamilton Area</a> (GTHA) expanded greatly during the 1950s, influenced by growth in immigration and industrialization. Much of the existing commuter service was provided by the <a href="page.php?w=Canadian_National_Railway">Canadian National Railway</a> (CN), which faced mounting pressure to expand its service beyond the Lakeshore trains</p><p>
<a accesskey="1" href="page.php?w=GO_Transit&amp;p=4">1.Previous</a><br />
<a accesskey="3" href="page.php?w=GO_Transit&amp;p=6">3.Next</a>
</p>

<do type="prev" label="Search">
        <go href="search.wml"/>
</do>

</card>
</wml>
