<p>latest that each activity can start and finish without making the project longer. This process determines which activities are "critical" (i.e., on the longest path) and which have no float/slack or "total float" zero (i.e., can not be delayed without making the project longer). In project management, a critical path is the sequence of project network activities that adds up to the longest overall duration, regardless of whether that longest duration has float or not. This determines the shortest time possible to complete the project. "Total</p><p>
<a accesskey="1" href="page.php?w=Critical_path_method&amp;p=5">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Critical_path_method&amp;p=7">3.Next</a>
</p>

<do type="prev" label="Search">
        <go href="search.wml"/>
</do>

</card>
</wml>