<?xml version="1.0" encoding='utf-8'?>
<!DOCTYPE wml PUBLIC "-//WAPFORUM//DTD WML 1.1//EN" "http://www.wapforum.org/DTD/wml_1.1.xml">
<wml>
<card id="card1" title="Gillies Highway - Page 6 - Wikipedia">
<p>
<a accesskey="1" href="page.php?w=Gillies_Highway&amp;p=5">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Gillies_Highway&amp;p=7">3.Next</a>
</p>
<p> but this route would be more beneficial to the <a href="page.php?w=Shire_of_Mareeba">Shire of Mareeba</a> rather than to the Shire of Eacham, so the original plan proceeded (although the <a href="page.php?w=Kuranda_Range_road">Kuranda Range Road</a> would later be built in 1940).</p>

<p>By March 1925, 150 men were employed building the road. It was officially opened on Saturday 10 July 1926 allowing travel between Cairns to the Tableland in 2½ hours. However, as the road was only wide enough for <a href="page.php?w=one-way_traffic">one-way traffic</a>,</p><p>
<a accesskey="1" href="page.php?w=Gillies_Highway&amp;p=5">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Gillies_Highway&amp;p=7">3.Next</a>
</p>

<do type="prev" label="Search">
        <go href="search.wml"/>
</do>

</card>
</wml>
