<?xml version="1.0" encoding='utf-8'?>
<!DOCTYPE wml PUBLIC "-//WAPFORUM//DTD WML 1.1//EN" "http://www.wapforum.org/DTD/wml_1.1.xml">
<wml>
<card id="card1" title="Strelasund Crossing - Page 6 - Wikipedia">
<p>
<a accesskey="1" href="page.php?w=Strelasund_Crossing&amp;p=5">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Strelasund_Crossing&amp;p=7">3.Next</a>
</p>
<p>The southern bridge ramp begins behind its junction with the Stralsund ring road (the <a href="page.php?w=Bundesstra%C3%9Fe_96">B 96 federal road</a>) and consists,  of an 85.53-metre-long embankment structure, measured to the <a href="page.php?w=abutment">abutment</a> of the first approach bridge. Beyond it are the two Stralsund approach bridges (Vorlandbrücken Stralsund) with gradients of up to 4%. The first, structure BW 1.1, is 327.5-metre-long bridge made of pre-stressed concrete with ten sections and a twin <a href="page.php?w=prestressed">prestressed</a></p><p>
<a accesskey="1" href="page.php?w=Strelasund_Crossing&amp;p=5">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Strelasund_Crossing&amp;p=7">3.Next</a>
</p>

<do type="prev" label="Search">
        <go href="search.wml"/>
</do>

</card>
</wml>
