<?xml version="1.0" encoding='utf-8'?>
<!DOCTYPE wml PUBLIC "-//WAPFORUM//DTD WML 1.1//EN" "http://www.wapforum.org/DTD/wml_1.1.xml">
<wml>
<card id="card1" title="The Exchange TRX - Page 6 - Wikipedia">
<p>
<a accesskey="1" href="page.php?w=The_Exchange_TRX&amp;p=5">1.Previous</a><br />
<a accesskey="3" href="page.php?w=The_Exchange_TRX&amp;p=7">3.Next</a>
</p>
<p>of the overall TRX master plan. Construction of the mall began in 2017 and was opened to the public on 29 November 2023 along with the operation of the district's underground tunnels in conjunction with TRX's big opening. The Exchange TRX was expected to be completed by third quarter of 2021 but was further delayed due to unfinished construction caused by the strict <a href="page.php?w=Malaysian_movement_control_order">Movement Control Order</a> (MCO) in the country from the <a href="page.php?w=COVID-19_pandemic_in_Malaysia">COVID-19 pandemic</a>.</p><p>
<a accesskey="1" href="page.php?w=The_Exchange_TRX&amp;p=5">1.Previous</a><br />
<a accesskey="3" href="page.php?w=The_Exchange_TRX&amp;p=7">3.Next</a>
</p>

<do type="prev" label="Search">
        <go href="search.wml"/>
</do>

</card>
</wml>
