<?xml version="1.0" encoding='utf-8'?>
<!DOCTYPE wml PUBLIC "-//WAPFORUM//DTD WML 1.1//EN" "http://www.wapforum.org/DTD/wml_1.1.xml">
<wml>
<card id="card1" title="Rapid bridge replacement - Page 6 - Wikipedia">
<p>
<a accesskey="1" href="page.php?w=rapid_bridge_replacement&amp;p=5">1.Previous</a><br />
<a accesskey="3" href="page.php?w=rapid_bridge_replacement&amp;p=7">3.Next</a>
</p>
<p>The seven-span 510 ft long bridge was completed in 2010 as the first NEXT beam bridge. The second design was introduced in 2010 for Sibley Pond Bridge at the border of <a href="page.php?w=Canaan%2C_Maine">Canaan</a> and <a href="page.php?w=Pittsfield%2C_Maine">Pittsfield, Maine</a>. The design was called "NEXT D" with an 8 in flange thickness that does not require deck topping, allowing the wearing surface to be applied directly onto the beams. The combination of F and D, called "NEXT E", was introduced in 2016.</p>

<p>As of 2018, thirteen US</p><p>
<a accesskey="1" href="page.php?w=rapid_bridge_replacement&amp;p=5">1.Previous</a><br />
<a accesskey="3" href="page.php?w=rapid_bridge_replacement&amp;p=7">3.Next</a>
</p>

<do type="prev" label="Search">
        <go href="search.wml"/>
</do>

</card>
</wml>
