<?xml version="1.0" encoding='utf-8'?>
<!DOCTYPE wml PUBLIC "-//WAPFORUM//DTD WML 1.1//EN" "http://www.wapforum.org/DTD/wml_1.1.xml">
<wml>
<card id="card1" title="Bruce Nuclear Generating Station - Page 7 - Wikipedia">
<p>
<a accesskey="1" href="page.php?w=Bruce_Nuclear_Generating_Station&amp;p=6">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Bruce_Nuclear_Generating_Station&amp;p=8">3.Next</a>
</p>
<p>generator set, with one high-pressure turbine and three low-pressure turbines driving one generator. The turbine hall is about 400 m long at each plant and houses the four turbine generator sets. Cooling water is taken from Lake Huron. There is (originally) one control room per 4 reactors.</p>

<p><big>Bruce A</big></p>
<p>Construction of Bruce A began in 1969, making it the successor to the <a href="page.php?w=Pickering_Nuclear_Generating_Station">Pickering A plant</a>. Bruce A units were originally rated at 750 MWe net / 805 MWe gross, which was later</p><p>
<a accesskey="1" href="page.php?w=Bruce_Nuclear_Generating_Station&amp;p=6">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Bruce_Nuclear_Generating_Station&amp;p=8">3.Next</a>
</p>

<do type="prev" label="Search">
        <go href="search.wml"/>
</do>

</card>
</wml>
