<?xml version="1.0" encoding='utf-8'?>
<!DOCTYPE wml PUBLIC "-//WAPFORUM//DTD WML 1.1//EN" "http://www.wapforum.org/DTD/wml_1.1.xml">
<wml>
<card id="card1" title="Dean Bridge - Page 7 - Wikipedia">
<p>
<a accesskey="1" href="page.php?w=Dean_Bridge&amp;p=6">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Dean_Bridge&amp;p=8">3.Next</a>
</p>
<p>with whom Telford had worked on the building of <a href="page.php?w=Aberdeen">Aberdeen</a> harbour. Work began in 1829 and was completed by the end of 1831. The stone was brought from Craigleith quarry near the village of <a href="page.php?w=Blackhall%2C_Edinburgh">Blackhall</a>.The footway was carried on outer segmental arches, the wooden supports of which had to be carefully removed, slowly and evenly, to allow the finished bridge to settle uniformly into its final position.  The resident engineer for the Works was <a href="page.php?w=Charles_Atherton_%28civil_engineer%29"> Charles Atherton</a>,</p><p>
<a accesskey="1" href="page.php?w=Dean_Bridge&amp;p=6">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Dean_Bridge&amp;p=8">3.Next</a>
</p>

<do type="prev" label="Search">
        <go href="search.wml"/>
</do>

</card>
</wml>
