<?xml version="1.0" encoding='utf-8'?>
<!DOCTYPE wml PUBLIC "-//WAPFORUM//DTD WML 1.1//EN" "http://www.wapforum.org/DTD/wml_1.1.xml">
<wml>
<card id="card1" title="Holyoke Canal System - Page 8 - Wikipedia">
<p>
<a accesskey="1" href="page.php?w=Holyoke_Canal_System&amp;p=7">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Holyoke_Canal_System&amp;p=9">3.Next</a>
</p>
<p>parks to the Canal District, parks already along the canal, and the historical downtown. By 2015, the Massachusetts Department of Transportation completed a new phase of sidewalk construction alongside the canals, opening the Canal Walk that linked the downtown to the then-new <a href="page.php?w=Holyoke_station">Holyoke station</a>. The canals are drained twice every year, in the spring and fall, to allow for maintenance.</p>

<p><big> Description </big></p>
<p>Today's canal system is 4.5 mi in length on three levels. The canals are now used for electrical</p><p>
<a accesskey="1" href="page.php?w=Holyoke_Canal_System&amp;p=7">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Holyoke_Canal_System&amp;p=9">3.Next</a>
</p>

<do type="prev" label="Search">
        <go href="search.wml"/>
</do>

</card>
</wml>
