<?xml version="1.0" encoding='utf-8'?>
<!DOCTYPE wml PUBLIC "-//WAPFORUM//DTD WML 1.1//EN" "http://www.wapforum.org/DTD/wml_1.1.xml">
<wml>
<card id="card1" title="South West Main Line - Page 8 - Wikipedia">
<p>
<a accesskey="1" href="page.php?w=South_West_Main_Line&amp;p=7">1.Previous</a><br />
<a accesskey="3" href="page.php?w=South_West_Main_Line&amp;p=9">3.Next</a>
</p>
<p>1837 and his replacement by <a href="page.php?w=Joseph_Locke">Joseph Locke</a>. </p>

<p>Locke assessed the progress of the construction works and estimated that around £1.7 million (£ million in ) would be required to complete the line. He dismissed many of the smaller contractors, awarding much of the remaining work to <a href="page.php?w=Thomas_Brassey">Thomas Brassey</a>. He also instituted a more rigorous supervision system by his assistant engineers. On 30 June 1837, the <a href="page.php?w=London_and_South_Western_Railway_Deviations_Act_1837">London and South Western Railway Deviations Act 1837</a></p><p>
<a accesskey="1" href="page.php?w=South_West_Main_Line&amp;p=7">1.Previous</a><br />
<a accesskey="3" href="page.php?w=South_West_Main_Line&amp;p=9">3.Next</a>
</p>

<do type="prev" label="Search">
        <go href="search.wml"/>
</do>

</card>
</wml>
