<?xml version="1.0" encoding='utf-8'?>
<!DOCTYPE wml PUBLIC "-//WAPFORUM//DTD WML 1.1//EN" "http://www.wapforum.org/DTD/wml_1.1.xml">
<wml>
<card id="card1" title="West Anglia Main Line - Page 8 - Wikipedia">
<p>
<a accesskey="1" href="page.php?w=West_Anglia_Main_Line&amp;p=7">1.Previous</a><br />
<a accesskey="3" href="page.php?w=West_Anglia_Main_Line&amp;p=9">3.Next</a>
</p>
<p>the line to Chingford included the Stratford -  - <a href="page.php?w=Hall_Farm_Curve">Hall Farm Junction</a> section (although this was never completed), the line from Liverpool Street to Broxbourne via Seven Sisters, and the Southbury Loop was electrified. The route via Tottenham Hale was still operated by diesel traction, the  <a href="page.php?w=Lea_Valley">Lea Valley</a> <a href="page.php?w=diesel_multiple_unit">diesel multiple unit</a>s (DMUs).</p>

<p>The line from Clapton Junction, on the <a href="page.php?w=Chingford_branch_line">Chingford branch line</a></p><p>
<a accesskey="1" href="page.php?w=West_Anglia_Main_Line&amp;p=7">1.Previous</a><br />
<a accesskey="3" href="page.php?w=West_Anglia_Main_Line&amp;p=9">3.Next</a>
</p>

<do type="prev" label="Search">
        <go href="search.wml"/>
</do>

</card>
</wml>
