<?xml version="1.0" encoding='utf-8'?>
<!DOCTYPE wml PUBLIC "-//WAPFORUM//DTD WML 1.1//EN" "http://www.wapforum.org/DTD/wml_1.1.xml">
<wml>
<card id="card1" title="Contingency (electrical grid) - Page 9 - Wikipedia">
<p>
<a accesskey="1" href="page.php?w=Contingency_(electrical_grid)&amp;p=8">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Contingency_%28electrical_grid%29&amp;p=10">3.Next</a>
</p>
<p>contingency planning is based on its advantages:<br/>
* each of the N elements in the system is analyzed separately, limiting the amount of work to be done and simplifying the failure options (e.g., generator failure, short circuit);<br/>
* the process inherently provides a way to deal with the contingency if and when it will happen.</p>

<p>The N-1 contingency planning is typically sufficient for the systems with the usual ratio of peak load to capacity (below 70%). For a system with a substantially higher ratio, the N-1 planning will not deliver</p><p>
<a accesskey="1" href="page.php?w=Contingency_(electrical_grid)&amp;p=8">1.Previous</a><br />
<a accesskey="3" href="page.php?w=Contingency_%28electrical_grid%29&amp;p=10">3.Next</a>
</p>

<do type="prev" label="Search">
        <go href="search.wml"/>
</do>

</card>
</wml>
